| Brazos Electric Power Cooperative, Inc. |
Godley Substation |
Labor and miscellaneous material contract for expansion of two existing 138kV substations. Sitework, grounding, conduit and cables, cable trench, foundations, steel structures, major equipment, buswork, testing and energization. |
June 2006 - August 2006 |
Gene Hoegenauer 254-750-6500 |
| Brazos Electric Power Cooperative, Inc. |
Krum Substation |
Labor and miscellaneous material contract for expansion of two existing 138kV substations. Sitework, grounding, conduit and cables, cable trench, foundations, steel structures, major equipment, buswork, testing and energization. |
April 2006 - June 2006 |
Gene Hoegenauer 254-750-6500 |
| Sho-Me Power Electric Power Cooperative |
Franks Substation Addition |
Labor and miscellaneous material contract for major expansion of 345kV substation. Sitework, grounding, conduit and cable trench, foundations, steel structures, major equipment, contro and power cables, buswork, testing and energization. |
May 2006 - August 2006 |
Craig Thomas 417-468-2615 |
| The Industrial Company |
Aragonne Mesa Interconnect Substation |
Labor and miscellaneous material contract for construction of new 138kV interconnect substation to connect the Aragonne Mesa windfarm to the Public Service New Mexico transmission system. |
August 2006 - October 2006 |
Mike Soule 505-472-0750 |
| City of Garland Power & Light |
Crist Road 138/13.8kV Substation (New) |
Labor and miscellaneous material contract for construction of a new 138/13.8kV Substation. Sitework, block wall, grounding, conduit and cables, cable trench, foundations, steel structures, major equipment, buswork, control/switch houses, testing and energization, demolition. |
Jan 2006 - May 2006 |
Ananth Palani 972-205-3016 |
| Texas - New Mexico Power Company - Owner Burns & McDonnell Engineering - Prime |
16th Street 138/13.8kV Substation Addition Ft. Stockton, Texas |
Labor and miscellaneous material contract for major expansion of existing 138kV substation. Sitework, grounding, conduit and cables, cable trench, foundations, steel structures, major equipment, buswork, testing and energization, demolition. |
May 2005 - July 2005 |
Tony Sommer 816-822-3548 |
| Pedernales Electric Cooperative, Inc. |
Blockhouse 138/24.9kV Substation Leander, Texas |
Labor and miscellaneous material contract for major expansion of existing 138kV substation. Sitework, grounding, conduit and cables, cable trench, foundations, steel structures, major equipment, buswork, testing and energization. |
April 2005 - June 2005 |
Darrel Mitchell 830-868-7155 |
| Brazos Electric Power Cooperative, Inc. |
Bowie 138kV Switch Station, Bowie, Texas and Sardis 138/25kV Substation Waxahachie, Texas |
Labor and miscellaneous material contract for major expansion of two existing 138kV substations/switch stations. Sitework, grounding, conduit and cables, cable trench, foundations, steel structures, major equipment, buswork, testing and energization. |
March 2005 - June 2005 |
Gene Hoegenauer 254-750-6500 |
| Transwestern Pipeline Company - Owner Ranger Plant Constructional Company, Inc. - General Contractor |
Bloomfield 138/25kV Substation 2005 Expansion Bloomfield, New Mexico |
Labor and miscellaneous material contract to add new 138kV transformer and 15kV auto switch with associated equipment to existing substation. Specialized grounding for natural gas pumping plant, conduit, steel structures, equipment, control and power cables, buswork, testing and energization. |
January 2005 - March 2005 |
Bill Strickland 325-677-2888
|
| Sho-Me Power Electric Power Cooperative |
McCartney Substation 161kV Terminal Addition Springfield, Missouri |
Labor and miscellaneous material contract for major expansion of 161kV substation. Sitework, grounding, conduit and cable trench, foundations, steel structures, major equipment, contro and power cables, buswork, testing and energization. |
November 2004 - March 2005 |
Craig Thomas 417-468-2615 |
| Alcoa, Inc. - Rockdale Operations Sandow Mine |
Three Oaks Mine 138/38kV Substation Projects Rockdale, Texas |
Labor and miscellaneous material contract for construction of three new 138/34.5kV substations. Sitework, fencing, grounding, conduit and cable trench, foundations, steel structures, major equipment, control and power cables, buswork, testing and energization, distribution lines, microwave tower foundations. |
September 2004 - May 2005 |
Lambert Skubal 512-446-8666 |
| BC Operating, Inc. |
H.S.A. 138/13.8kV Substation |
Labor and miscellaneous material contract for complete reconstruction of an existing 138kV substation. Grounding, conduit, steel structures, major equipment, control and power cables, buswork, testing and energization, demolition. |
January 2004 - February 2004 |
|